📈💰

ROI Projections for Windsor Towers

Stable 75.2% Uplift with Green Premiums

Windsor Towers: Latest Revised Concept Plans October 2023 – 'It Can Be Done!'

Enhanced Model Overview

Building on Generis' October 2023 feasibility study (with >80% owner support as of August 2024), these projections show modular enhancements delivering a 75.2% ROI uplift on the base $181M costs—driven by $19.9M green premiums, $500K annual energy revenue, and $15M capitalized savings. Net enhancement cost: $14.5M (fully offset by ARENA grants and study surpluses).

Download full docs: Enhanced ROI Summary | Understanding ROI

Key Projections Table

Metric Base (Generis) Enhanced (Offsets/Upsides) Stress-Test Floor
Total Costs$181M$195.5M ↑$210.5M
Revenue$265M$284.9M ↑$260M
Profit$84M$104.4M ↑$49.5M
Equity Return$20M$22.5M ↑$12.5M
ROI (%)66.775.241.7
Annual CO2e Reduction (t)08,937 ↑4,500
Scalability (Strata Schemes)LowHigh (300K+ AU replicable)High (buffered)

Impact: +8.5 ROI points; outperforms Perth's 15-25% benchmarks. No owner contributions—Generis absorbs overruns.

Back to Opportunities Schedule ROI Review

Disclaimer: Windsor Sustainable Innovations Pty Ltd is an independent facilitator exploring practical enhancements to support the Windsor Towers redevelopment. All views and proposals are WSI's alone and do not represent or bind Generis, the Building Options Committee (BOC), or Council of Owners (COO). For official updates, contact the BOC. Privacy policy: privacy.html